Project Name: Fourways Mall Backup Power Solution
Timeframe: 1 month (February 2023)
Location: Fourways, Johannesburg
Article:
“Keeping Fourways Mall Operational with Backup Power”
Ocean Construction Projects installed and maintains a 500kVA diesel generator for Fourways Mall, ensuring uninterrupted operations during load-shedding.
Our work included:
- Designing a custom ATS system for seamless power transfer.
- Conducting load bank testing to ensure optimal performance.
- Providing 24/7 maintenance support for reliability.
The mall has experienced zero downtime since installation, even during extended power outages.